In 2008, Dragon Oil continued its programme to renew its infrastructure by adding additional capacity, removing production bottlenecks and expanding export capability.

Delivery on Promises

January

9 January 2008

The Dzheitune (Lam) 22/124 well completed yielding a combined rate of 2,414 bopd with a depth of 3,841 metres using the CIS 1 Rig from the Dzheitune (LaM) 22 platform.

March

20 March 2008

Dzheitune (Lam) A/125B well completed yielding a combined rate of 4,082 bopd with a depth of 4,080 metres using the Iran Khazarig from the Dzheitune (Lam) A platform.

April

22 April 2008

Announced initial noncommercial findings from Blocks 49 in Dragon Oil’s
non-operated acreage in the Republic of Yemen, with geological and geophysical analysis ongoing.

23 April 2008

Unprecedented cold weather in Turkmenistan momentarily slowed production from the Dzheitune (Lam) 28/120 requiring the well to be shut in and for a new coflex alternative pipeline to be installed.

29 April 2008

Dzheitune (Lam) 22/126 completed yielding a combined rate of 2,795 bopd with a depth of 4,307 metres using the CIS 1 Rig from the Dzheitune (Lam) 22 platform.

Restored production flow from well Dzheitune (Lam) 28/120, which was shut in due to technical problems arising from the extreme weather conditions in Turkmenistan.

May

1 May 2008

Appointment of Abdul Jaleel Al Khalifa to the role of Chief Executive Officer, with Hussain M. Sultan continuing in the role of Executive Chairman.

June

5 June 2008

Dzheitune (Lam) A/127 well on completed yielding a combined rate of 3,674 bopd with a depth of 3,627 metres using the Iran Khazar rig from
the Dzheitune (Lam) A platform.

July

16 July 2008

Dzheitune (Lam) 22/128 completed yielding a combine rate of 2,600 bopd. CIS 1 Rig, Lam 22 platform, 3848 metres.

21 July 2008

Awarded US$170 million contract for the construction of a new 30-inch, 40-km trunkline to bring all of Dragon Oil’s oil and gas onshore to its Central Processing Facility.

August

29 August 2008 

Dzheitune (Lam) A/129 well completed yielding a combined rate of 2,123
bopd with a depth of 4,135 metres using the Iran Khazar rig from the Dzheitune (Lam) A platform.

September

26 September 2008

Board Restructuring

Resignation of Hussain M. Sultan from the role of Executive Chairman.

Appointment of Mohammed Al Ghurair as Non-Executive Chairman.

Appointment of Abdul Jaleel Al Khalifa, Chief Executive Officer as an Executive Director on the Board of the Company.

November

12 November 2008

Dzheitune Lam 22/130 well completed yielding a combined rate of 2,057
bopd with a depth of 3,770 metres using the CIS Rig from the Dzheitune (Lam) 22 platform.

Dzheitune Lam A/131 well completed yielding a combined rate of 4,621
bopd with a depth of 4,120 metres using the Iran Khazar rig from the Dzheitune (Lam) A platform.

December

30 December 2008

Dzheitune Lam 21/132 completed yielding an initial rate of 916 bopd. Drilling of this well stopped at 3,001 metres when it encountered pressures that were higher than expected. As a result the main intended deeper intervals will not be penetrated, however, there are plans to revisit this well at a later date in order to reach the main targets.